Project Photo Gallery
Each photo below is approximately 25 KB in size (about 5 seconds of download time per photo when using a 56.6K Modem), so this page may take some time to load completely.
Pond 2: Looking to the East
Channel between Pond 2 and Pond 3: Looking to the South
Pond 3: Looking to the East
Pond 1 Excavation Work: Looking to the West
Clearing and Grubbing Work Completed for Pond 4: Looking to the Southwest
Temporary Access Road off 62nd Street Cleared Through Wetland to Reach Pond 5: Looking North
Dewatering Equipment on West Side of Pamela Lake
Submersible Pump Within Perforated Metal Standpipe
Project Sign on the North Side of Pond 2 Along 58th Street
Construction of the Pedestrian Bridge and Skimmer Structure
|